Before laying porcelain tiles, make the necessary preparations.
After the house has been delivered, you must decorate it; however, do you know how to decorate a house? If you do not know the steps of house decoration, it is likely that a variety of problems will arise during the decorating process, affecting the effect of the house decoration, so what are the steps of house decoration? If you're curious, keep reading!
I. Measuring and designing
You can find professional people to help design and check before you decorate your own house to have data measurement aside, and then do a good job of decoration design, taking into account the functionality and aesthetics of each room. Formally carry out renovation construction before the main part of the demolition to do, will need to remove the infill walls, doors, and windows, plumbing, and electrical piping, etc. all demolished, and then the site framework to build, according to the design drawings.
2, plumbing and electrical upgrades
Renovation workers must be the first to consider how to do plumbing and electrical renovation, because there will be a lot of plumbing pipes and circuit pipes bought to the wall and underground, how to arrange water supply, drainage location fixed light position, light slot, put the line, and so on, all of which will lead to subsequent rework if you do not do a good job. Now, for the wall without the tile treatment, apply the base coat first, followed by the surface coat. If you want to do wallpaper, you should only deal with the grassroots.
3. Decoration of the kitchen and bathroom
Following the installation of plumbing and electrical wiring, you must decorate the kitchen and bathroom. First, the kitchen and bathroom ceilings must be installed, followed by exhaust fans, bath bombs, and ceiling lights. After the preceding steps have been completed, kitchen cabinets can be installed. While going plumbing and electrical renovation can be invited to the site of carpentry, the riser, decorative ceiling, plaster line, and other data measured and started making, these will be used later, can be prepared in advance so that the construction period can be reduced.
4, tile, white paint or latex paint scraping
Now comes the tiling, the kitchen and bathroom, over the door stone, window sills, and other places where the wall and floor tile paving needs to be done. Floor drains should be installed first in the kitchen, bathroom, and balcony, followed by paving tiles. After installing a good range hood, kitchen tiling. Need to brush latex paint or paint the area can be brushed, scraping white when the indoor temperature needs to be controlled at around 10 °C if the temperature is too low, the wall is prone to cracking, scraping white can be installed after the floor
5, the placement of lamps and lanterns, furniture, and appliances in the home
Finally, install lamps, doors, and switches while repairing some details of the decoration part, after finishing the decoration to clean, then install curtains and move into the furniture and appliances. The simple decoration is usually completed in about two months; however, depending on the owner's requirements, the decoration time may appear to shorten or extend the situation.
We can see from the preceding steps that if you buy the rock board, then generally in the fourth step to carry out the current home furnishings primarily with the rock board areas are kitchen countertops, kitchen walls and floors, bathroom walls and floors, bathroom cabinet countertops, living room walls and floors, bedroom bedside backdrop, sofa backdrop, health TV backdrop, floor, window sill, entrance hall, dining table coffee table, and so on.
Some places must be prepared in advance for installation, such as kitchen countertops and flooring, which must be done in the advance cabinet, according to the size of the cabinet in the processing plant to process the specific size. The floor paving must be waterproofed and leveled, and the background wall paving must be leveled or have a good woodworking bottom. Dining table coffee table These are not too many requirements, and the size can be configured according to the size of their own space.