Before laying porcelain tiles, make the necessary preparations.
You'll need to decorate the house after it's been delivered, but do you know how to do that? If you don't know the steps of house decoration, a variety of problems are likely to arise during the decorating process, affecting the effect of the house decoration, so what are the steps of house decoration? Continue reading if you're curious!
I. Design and measurement
You can find professional people to help design and check before you decorate your own house to have data measurement aside, and then do a good job of decoration design, taking into account the functionality and aesthetics of each room. Formally carry out renovation construction prior to the main part of the demolition to do, according to the design drawings, will need to remove the infill walls, doors, and windows, plumbing, and electrical piping, and then the site framework to build.
2. Renovating the plumbing and electrical systems
Because there will be a lot of plumbing pipes and circuit pipes bought to the wall and underground, how to arrange water supply, drainage location fixed light position, light slot, put the line, and so on, renovation workers must be the first to think about how to do plumbing and electrical renovation, because there will be a lot of plumbing pipes and circuit pipes bought to the wall and underground, how to arrange water supply, drainage location fixed light position, light slot, put the line, and so on, all of these steps, if you do not Now, for the wall that hasn't been tiled, start with the base and work your way up to the surface. If you want to make wallpaper, you should stick to the basics.
3. Decoration of the kitchen and bathroom
After the plumbing and electrical wiring have been installed, you must decorate the kitchen and bathroom. This includes installing the kitchen and bathroom ceilings, exhaust fans, bath bombs, and ceiling lights. After the above has been completed, kitchen cabinets can be installed. While doing plumbing and electrical renovations, carpenters can be invited to the job site to measure and start making risers, decorative ceilings, plaster lines, and other data that will be used later. These can be prepared in advance so that the construction period is cut short.
4, scrape latex paint or paint white on the tile
Now for tiling in the kitchen and bathroom, as well as over the door stone, window sills, and other areas where the wall and floor tile paving is required. Floor drains should be installed first in the kitchen, bathroom, and balcony, followed by paving tiles. After installing a good range hood, kitchen tiling. When the indoor temperature needs to be controlled at around 10 °C, scraping white can be installed after the floor. If the temperature is too low, the wall is prone to cracks, scraping white can be installed after the floor.
5. furnishing the residence with lamps, lanterns, furniture, and appliances
Finally, install lamps, doors, and switches while repairing some decoration details. Once the decoration is complete, clean the space before installing curtains and moving in furniture and appliances. Simple decoration takes about two months to complete; however, depending on the requirements of the owner, the decoration time may appear to be shorter or longer.
We can see from the above steps that if you buy the rock board, the fourth step is to carry out the current home furnishings primarily with the rock board areas such as kitchen countertops, kitchen walls and floors, bathroom walls and floors, bathroom cabinet countertops, living room walls and floors, bedroom bedside backdrop, sofa backdrop, health TV backdrop, floor, window sill, entrance hall, dining table coffee table, and so on.
Some areas must be prepared in advance for installation, such as kitchen countertops and flooring, which must be done in an advance cabinet, according to the size of the cabinet in the processing plant to process the specific size. The background wall paving must be leveled or play a good woodworking bottom, and the floor paving must do a good job of waterproofing and leveling work. There aren't too many requirements for a dining table coffee table, and they can be configured according to the size of their own space.